Execution
In this roadmap step, the switch to the target system takes place.
The SUM completes the copy import action during downtime for all tables with set triggers. The EU_SWITCH phase completes the switch to the new system. All tables prepared in the shadow system are copied to the target system. The KX_SWITCH_1 phase switches the SAP kernel. The PARCONV_UPG phase converts the application table, and the phase TABIM_UPG imports the remaining data. Finally, the XPRAS_AIMMRG phase starts the XPRAs required by the system.
The following DMO-specific actions are carried out:
-
Migration of application data
-
Repository and kernel switch
-
Adoptions of structures to new release (phase PARCONV)
-
Main import (phase TABIM)
-
XPRAS
-
Migration of application data from source database to target database
-
You can change the number of R3load processes dynamically in the SUM Utilities (Extended UI).
-
Consistency of the migrated content is checked by the command SELECT COUNT(*) FROM "<table_name>" on each table.
-
Time estimation for the overall process and for long-running phases is written to the file <SUM directory>/abap/log/SAPupStat.log
