System Move: Preparing Target System Landscape
This preparatory step is relevant, if you want to perform a system move during the SUM with DMO run.
Context
In addition to the required preparation steps in the source system landscape (such as providing the stack.xml file and the SAP HANA database client archive, or updating SAP Host Agent), you prepare the target system landscape to perform a move to a new primary application server (PAS).
For more information about the system move, see System Move: Enabling DMO with System Move.

