Conversion to SAP S/4HANA using SUM: ABAP Systems on UNIX and Linux
System Move: Preparing Target System Landscape
This preparatory step is relevant, if you want to perform a system move during the SUM
with DMO run.
Context
In addition to the required preparation steps in the source system
landscape (such as providing the stack.xml file and the SAP
HANA database client archive, or updating SAP Host Agent), you prepare the
target system landscape to perform a move to a new primary
application server (PAS).