Downtime-Optimized Conversion

Handling Errors During Uptime Replication

Context

You have observed that R3load buckets are aborted during the uptime replication monitoring.

Procedure

  1. During the phase MIGRATE_OPTDMO_REPLAY_RUN, check for the error directly in the R3load bucket log.
  2. Reschedule the failed buckets via the corresponding buttons in the CRR Control Center.