Postprocessing
This section deals with ZDO-specific activities in the Postprocessing roadmap step of the Software Update Manager.
Preparation of User Roll-Back to Original System
In phase MAIN_BRITRANS/REQ_USER_ROLLBACK_PREP, users are transferred from the bridge subsystem (V1) back to the production system (V2). All users must log off from the bridge subsystem.
Confirm the dialog in SUM by choosing Next.
Completion of User Rollback to the Original System
The update procedure is complete. All users can log on again to the original productive system. Confirm the dialog in SUM by choosing Next.